SUBSURFACE TRANSFORMERS AND NETWORK PROTECTORS SUBCOMMITTEE

SCOPE

  • Study and review the engineering aspects of secondary network protectors and secondary network transformers (liquid filled and dry-type) and three phase subsurface type distribution transformers rated 2500 kVA and smaller, with a high voltage of 35,000 volts and below, and a low voltage of 480 volts and below;
  • Develop and maintain related standards, recommended practices and guides for such products;
  • Coordinate with other technical committees, groups, societies and associations as required.
CHAIR VICE CHAIR
SECRETARY
George Payerle
Carte International Inc.
7393 Meadow Creek Rd.
Northfield, OH 44067, U.S.A.
Phone: +1 330 908 0418
email: georgepayerle@gmail.com
Clemens (Tony) Reiss
Custom Materials, Inc.
16865 Park Circle Drive
Chagrin Falls, OH 44023, U.S.A.
Phone: +1 440 478 4471
email: treiss@custommaterials.com
Open
.

SC AGENDA/TOPICS FOR NEXT MEETING

..
For previous meeting minutes, see Transformers Committee Meetings

WORKING GROUPS/TASK FORCES

Standard Title Officers Status Drafts Documents
C57.12.23
WG
IEEE Standard for Submersible Single-Phase Transformers: 250 kVA and Smaller; High Voltage 34 500GrdY/19 920V and Below; Low Voltage 600 V and Below Chair: Alan Traut
Phone: +1 859 221 9144
atraut@ieee.org
Vice-Chair: Open
Phone:
.
Inactive 
Pub. 2018
Rev Due: 12/31/2028
.
. .
. .
. .
. .
C57.12.24
WG
IEEE Standard for Submersible, Three-Phase Transformers, 3750 kVA and Smaller: High Voltage, 34 500 GrdY/19 920 Volts and Below; Low Voltage, 600 Volts and Below Chair: Ben Garcia
Phone: +1 714 895 0787
Benjamin.Garcia@SCE.com
Vice-Chair: Tom Dauzat
Phone: +1 225 937 8154
thomas.dauzat@ge.com
Secretary: George Payerle
Phone: +1 330 908 0418
gpayerle@roadrunner.com
Active
Pub. 2016
Rev Due: 12/31/2026
PAR Exp.: 12/31/2023
. . Fall 2021 Minutes (Unapproved) 3Dec2021
GEC-1128 Understanding Stainless Steel 18May2019
IEEE TF Materials & Corrosion Report 18May2019
Fall Presentation- Galvanic Corrosion 23Oct2018
Spring 2018 Corrosion & Cathodic Protection 10Apr2018
Fall 2017 Powertech Corrosion 14Nov2017
C57.12.40
WG
IEEE Standard for Network, Three-Phase Transformers, 2500 kVA and Smaller; High Voltage, 34 500 GrdY/19 920 and Below; Low Voltage, 600 V and Below; Subway and Vault Types (Liquid Immersed) Chair: David Blew
Phone: +1 973 220 1663
david.blewiv@pseg.com
Secretary: Dan Schwartz
Phone: +1 330 397-2421
schwartz@qualityswitch.com
Active
Pub. 2017
Rev Due: 12/31/2027
PAR Exp.: 12/31/2023
. . Fall 2021 Minutes (unapproved) 3Dec2021
Submersible Network Transformers Presentation 10Apr2018
Spring 2018 Powertech Stainless Steel Presentation 10Apr2018
C57.12.44
WG
IEEE Standard Requirements for Secondary Network Protectors Chair: Mark Faulkner
Phone: +1 864 993 0509
Markafaulkner@eaton.com
Vice-Chair: Alex Macias
Phone: +1 713 207 4556
alex.macias@centerpointenergy.com
Active
Pub. 2014
Rev Due: 12/31/2024
PAR Exp.: 12/31/2022
C57.12.44 Edited 2 11Oct2018 Fall 2021 Minutes (Unapproved) 3Dec2021
. .
C57.12.57
.
IEEE Requirements for Ventilated Dry-Type Network Transformers 2500 kVA and Below, Three-Phase with High Voltage 34 500 Voltas and Below, Low Voltage 216Y/125 and 480Y/125 Volts Chair: .
Phone: .
.
Inactive
Withdrawn 2001 No longer endorsed by IEEE
. .
C57.167
WG
Guide for Monitoring Distribution Transformers Chair: Gary Hoffman
Phone: +1 973 474 2171
grhoffman@advpowertech.com
Vice-Chair: Mike Thibault
Phone: +1 209 628 3126
mltc@pge.com
Active
New Project
PAR Exp.: 12/31/2022
. . NOTE: SEE DISTRIBUTION SC FOR POSTINGS FOR THIS WG
TF Corrosion effects on subsurface transformers Chair: Will Elliott
Phone: +1 318 286 2868
william.elliott@prolec.energy
Vice-Chair: Justin Minikel
Phone: +1 262 835 3371
justinminikel@eaton.com
Secretary: Audrey Siebert-Timmer
Phone: +1 604 734 0105
audrey.siebert-timmer@ifdcorporation.com
Active
.
.
Recommendations D4 17Sep2021
. .
Fall 2021 Minutes (unapproved) 3Dec2021 
Fall 2021 Mtg Slides 3Dec2021
Spring 2021 CT Scan Summary 12May2021
Fall 2020 Material Compatibility 4Nov2020
Fall 2020 Salt Spray 4Nov2020
Fall 2020 Corrosion Measurements 19Nov2019
Manhole Corrosion Presentation – Byrd 19Nov2019