POWER TRANSFORMERS SUBCOMMITTEE
SCOPE
- Study and review engineering aspects of liquid filled power transformers, including transmission transformers, primary unit substation transformers, generator step-up transformers, phase angle regulating transformers, and related products;
- Develop and maintain related standards, recommended practices and guides for such products;
- Coordinate with other technical committees, groups, societies and associations as required.
CHAIR | VICE CHAIR |
SECRETARY |
---|---|---|
Bill Griesacker Dusquesne Light Company 154 Dover Drive Coraopolis, PA 15108, U.S.A. Phone: +1 412 916 6446 email: wgriesacker@duqlight.com |
Alwyn VanderWalt Public Service Co. of New Mexico 4201 Edith Blvd NE Albuquerque, NM 87107, U.S.A. Phone: +1 505 241 3469 email: alwyn.vanderwalt@pnm.com |
Dan Blaydon Baltimore Gas & Electric 2900 Lord Baltimore Drive Baltimore, MD 21244, U.S.A. Phone: +1 410 470 8827 email: daniel.blaydon@exeloncorp.com |
SC AGENDA/TOPICS FOR NEXT MEETING
Fall 2019 Agenda 21Oct2019
For previous meeting minutes, see Transformers Committee Meetings
PREVIOUS MEETING DISCUSSIONS/TOPICS
. .
WORKING GROUPS/TASK FORCES
Standard | Title | Officers | Status | Drafts | Documents |
---|---|---|---|---|---|
C57.12.10 WG |
230kV and Below Safety Requirement | Chair: Gary Hoffman Phone: +1 973 474 2171 grhoffman@advpowertech.com |
Inactive Pub. 2018 Rev Due: 12/31/2028 . |
. . . . |
. . . . |
C57.17 | Requirements for Arc Furnace Transformers | Chair: Robert Ganser Phone: +1 330 492 8433 rganser@ieee.org Vice-Chair: Phone: . |
Inactive Pub. 2012 Rev Due: 12/31/2022 |
. | . |
C57.93 WG |
IEEE Guide for Installation and Maintenance of Liquid-Immersed Power Transformers | Chair: Mike Lau Phone: +1 604 224 9343 mike.lau@wicor.com Secretary: Scott Reed Phone: +1 304 280 2864 sreed@mvadiagnostics.com |
Inactive Pub. 2019 Rev Due: 12/31/2029 . |
. . . . |
. . . . |
C57.116 | IEEE Guide for Transformers Directly Connected to Generators | Chair: Weijun Li Phone: +1 781 348 1076 wli@beld.com Vice-Chair: Jason Varnell jason.r.varnell@ieee.org Secretary: Bill Griesacker bgriesacker@verizon.net |
Active Approved 2014 Rev Due: 12/31/2024 PAR Exp.: 12/31/2023 |
PAR 1Oct2020 | Fall 2020 Agenda 1Oct2020 |
C57.117 | IEEE Guide for Reporting Failure Data for Power Transformers and Shunt Reactors on Electric Utility Power Systems | Chair: Wallace Binder Phone: +1 724 654 3839 wbbinder@ieee.org |
Inactive Withdrawn |
. | . |
C57.125 WG |
IEEE Guide for Failure Investigation, Documentation, Analysis and Reporting for Power Transformers and Shunt Reactors | Chair: Wallace Binder Phone: +1 724 654 3839 wbbinder@ieee.org Vice-Chair: Tom Melle Phone: +1 919 239 5943 trmelle@ncsu.edu |
Inactive Approved 2015 Rev Due: 12/31/2025 |
. | . |
C57.135 | IEEE Guide for the Application, Specification and Testing of Phase-Shifting Transformers | Chair: Jin Sim jin.sim@ieee.org |
Inactive Pub. 2011 IEEE/IEC Dual Logo 2005, IEC 62032 Ed. 1 Rev Due: 6/16/2021 |
. | . |
C57.140 | IEEE Guide for Evaluation and Reconditioning of Liquid-Immersed Power Transformers | Chair: Paul Boman Phone: +1 785 256 7161 paul_boman@hsb.com |
Inactive Pub. 2017 Rev Due: 12/31/2027 |
. | . |
C57.143 WG |
IEEE Guide for Application of Monitoring to Liquid-Immersed Transformers and Components | Chair: Mike Spurlock Phone: +1 614 769 5501 mspurlock@ieee.org Vice-Chair: Poorvi Patel Phone: +1 704 232 4551 ppatel@epri.com Secretary: Elizabeth Bray Phone: +1 205 992 7136 ebbray@southemco.com |
Active Pub. 2012 Rev Due: 12/31/2022 PAR Exp.: 12/31/2021 |
C57.143D1.1.docx 16Oct2020 |
Fall 2020 Agenda 28Sep2020 Fall 2019 Minutes 5Mar2020 Volunteer List 3Jun2020 |
C57.148 WG |
IEEE Standard for Control Cabinets for Power Transformers | Chair: Joe Watson Phone: +1 561 371 9138 joe_watson@ieee.org Vice-Chair: Weijun Li Phone: + 781 348 1076 wli@beld.com Secretary: Jean-Francois Collin Phone: +1 418 681 0909 jfcollin@nomossystemes.com |
Active 90% Pub. 2011 Rev Due: 12/31/2021 PAR Exp.: 12/31/2020 |
C57.148-2011 DOC Special Password C57.148-2011 PDF Special Password |
. |
C57.150 WG |
Guide for the Transportation of Transformers and Reactors Rated 10,000kVA or Larger | Chair: Greg Anderson Phone: +1 402 680 1111 gwanderson@ieee.org Vice-Chair: Ewald Schweiger ewald.schweiger@ieee.org Secretary: Marnie Roussell Phone: +1 504 576 7371 einram10@comcast.net |
Active 10% Pub. 2012 Rev Due: 12/31/2022 PAR Exp.: 12/31/2022 |
C57.150 D1.1 3Jan2020 CIGRE 673 Special Password |
Fall 2019 Minutes 3Jan2020 Fall 2019 WG Assignments 3Jan2020 Fall 2018 Presentation – Swimlanes 29Oct2018 Fall 2018 – CIGRE Review – Schweiger 29Oct2018 Fall 2018 – CIGRE 673 Vs C57.150 29Oct2018 |
C57.153 | IEEE Guide for Paralleling Transformers | Chair: Tom Jauch Phone: +1 813 634 1422 jauch@ieee.org |
Inactive Approved 2015 Rev Due: 12/31/2025 |
. | . |
C57.156 | IEEE Guide for Transformer Tank Rupture Mitigation of Liquid-Immersed Power Transformers and Reactors | Chair: Peter Zhao Phone: +1 416 345 5926 peter.zhao@hydroone.com |
Inactive Pub. 2016 Rev Due: 12/31/2026 |
. | . |
C57.157 | IEEE Guide for Conducting Functional Life Tests for De-Energized Tap Changer Contacts | Chair: Phil Hopkinson Phone: +1 704 846 3290 phopkinson@ieee.org |
Active Approved 2015 Rev Due: 12/31/2025 |
. | . |
C57.170 | Condition Assessment of Transformers | Chair: Kumar Mani Phone: +1 919 546 2791 kumar.mani@duke-energy.com Vice-Chair: James Cross Phone: +1 647 489 7920 james.cross@kinectrics.com Secretary: Akash Joshi Phone: +1 919 462 7316 JoshiAD@bv.com |
Active TF New Project PAR Exp: 12/31/2023 |
C57.140-2017 C57.143-2012 C57.152-2013 CIGRE_TB445 CIGRE_TB630 CIGRE_TB761 Spec. PW required |
Fall 2020 Agenda 16Oct2020 Fall 2020 Unapproved Minutes 7Novt2020 Fall 2020 Task Force List 7Novt2020 A2-49 CigrePoster 5Oct2018 A2-49 Cigre & IEEE Comparison Table 5Oct2018 |
IEEE 638 | IEEE Standard for Qualification of Class 1E Transformers for Nuclear power Generating Stations | Chair: Craig Swinderman Phone: +1 901 566 3801 craig.swinderman@meppi.com |
Inactive Approved 2013 Rev Due: 12/31/2023 |
. | . |
IEEE/IEC 60076-57- 1202 |
IEEE Standard Requirements for Phase Shifting Transformers | Chair: Raj Ahuja Phone: +1 408 209 5513 rajahuja2@icloud.com |
Active Pub. 2016 Rev Due: 12/31/2026 |
. | . |
P60214-1- 57-131 WG |
Tap-Changers – Part 1: Performance requirements and test methods | Chair: Craig A. Colopy Phone: +1 262 896 2342 CraigAColopy@Eaton.com Vice-Chair: Axel Kraemer Phone: +49 941 4090 4050 A.Kraemer@reinhausen.com Secretary: Adam Sewell Phone: +1 330 872 5707 adamsewell@qualityswitch.com |
Active C57.131 Pub. 2012 Rev Due: 12/31/2022 . |
. . . . |
. . . . |
P60214-2 WG |
Tap-Changers – Part 2: Application guide | Chair: Craig A. Colopy Phone: +1 262 896 2342 CraigAColopy@Eaton.com Vice-Chair: Axel Kraemer Phone: +49 941 4090 4050 A.Kraemer@reinhausen.com Secretary: Adam Sewell Phone: +1 330 872 5707 adamsewell@qualityswitch.com |
Inactive Pub: 2019 |
. . . . |
. . . . |
TF
|
V/Hz | Chair: Kipp Yule Phone: kjyule@bechtel.com Secretary: Joe Watson Phone: Joe_watson@ieee.org |
Active | . | . . . . |