|
Minutes of
Previous Meetings
See
Transformers Committee Minutes
Spring
2010 SC Agenda posted
02Mar2010
Documents
from Spring 2007 Meeting:
Seismic
Qualifications posted 5Mar2007
Seismic
Qualification Letter posted 5Mar2007
Bushing
Advisory Committee Memo posted 5Mar2007
Issues
and Research Related to the Qualification of the Transformer-Bushing
System, by Anshel J.
Schiff posted 2Mar2007
Spring
2006 - IEC
Bushing Report
Seismic
Presentation by Anshell Schiff
C57.19.01
Reaffirmation Status
C57.19.03
Corragenda 01Status
Status
/ Meeting Agenda
Task
Force to revise C57.19.100:
Spring
2009 Agenda posted 18Apr2009
Fall
2008 Meeting Minutes posted 18Apr2009
C57.19.100
Draft 4 posted
29Apr2010
Previous
Mtg. Documents
C57.19.100
Draft 2 Proposed changes posted 18Apr2009
C57.19.100
Draft 1 posted 12Oct2007,
password required to access
Draw
Lead and Draw Rod Definitions and Applications posted 15Mar2006
Bushing
Replacement posted 15Mar2006
Check
list for Ordering Replacement Bushings posted 15Mar2006
Guide for Application of Power Apparatus
Bushings (Proposed New Clause 9.3)
Bushing
Monitors
Bushing
Storage
Guide for Application of Power Apparatus
Bushings (Proposed revisions to Clause 10.2)
Bushing
Monitoring System
On-Line
Monitoring Using Bushing or CT Capacitor Taps
Bushing
Sensors
Guidelines on Draw Lead
Applications
Temperature
Calculation for Short-time Load above Bushing Rating
Bushing
Repair
Mounting angle greater than 20
degrees
RG
Bushing Doble Testing
|